%
- Air condenser.- Vertical turbine, ideal for restaurants, requires little maintenance and is very easy to use. - Easy installation due to its compact size. - Minimum mixing capacity 0.5 lit. and maximum 1 lit. - Noise level lower than 70 dB. - Cycle with time control or temperature control. - Vertical evaporator cylinders for a larger exchange surface. - Exclusive distribution device. - System self diagnosis. - Cycle time: 15/20 min. - Hourly production: 5 liters. NB: mainly for cold work.
%
Fourneau quatre becs avec piétements. 9KW par bec. Plus d'infos sur demande.
%
- Air condenser.- Vertical turbine with automatic extraction. - Minimum mixing capacity 2 litres and maximum 4 litres. - Noise level below 70 dB. - Vertical evaporator cylinders for a larger exchange surface. - Cycle with time control or temperature control. - Exclusive distribution device. - System self diagnosis. - Cycle time: 10/15 min. - Hourly production: 20 litres. NB: mainly for cold work, delivered on wheels.
%
Four sur piétement six becs. 9KW par bec. Plus d'infos sur demande.
%
%
Fourneau 8 becs sous piétement. 9Kw par bec plus d'infos sur demande.
%
- Air condenser.- Vertical turbine with automatic extraction. - Minimum mixing capacity 2 litres and maximum 4 litres. - Noise level below 70 dB. - Vertical evaporator cylinders for a larger exchange surface. - Cycle with time control or temperature control. - Exclusive distribution device. - System self diagnosis. - Cycle time: 10/15 min. - Hourly production: 20 litres. NB: mainly for cold work, delivered on wheels.
%
Fourneau sur piétement avec 4 becs. 2 becs de 9 Kw. 2 becs de 17Kw. plus d'infos sur demande.
%
- Air condenser.- Vertical turbine with automatic extraction.- Minimum mixing capacity 3 lit. and maximum 7 lit.- Noise level below 70 dB.- Vertical evaporator cylinders for a larger exchange surface.- Cycle with time control or temperature control.- Exclusive distribution device. - System self diagnosis.- Cycle time: 8/12 min.- Hourly production: 50 litres.NB: mainly for cold work
%
%
- Air condenser.- Vertical turbine with automatic extraction.- Minimum mixing capacity 3 lit. and maximum 7 lit.- Noise level below 70 dB.- Vertical evaporator cylinders for a larger exchange surface.- Cycle with time control or temperature control.- Exclusive distribution device. - System self diagnosis.- Cycle time: 8/12 min.- Hourly production: 50 litres.NB: mainly for cold work.
%
- Water condenser.- Vertical turbine with automatic extraction.- Minimum mixing capacity 3 lit. and maximum 7 lit.- Noise level below 70 dB.- Vertical evaporator cylinders for a larger exchange surface.- Cycle with time control or temperature control.- Exclusive distribution device. - System self diagnosis.- Cycle time: 8/12 min.- Hourly production: 50 litres.NB: mainly for cold work.
%
%
- Air condenser.- Vertical turbine with automatic extraction.- Minimum mixing capacity 4 lit. and maximum 8 lit.- Noise level below 70 dB.- Vertical evaporator cylinders for a larger exchange surface.- Cycle with time control or temperature control.- Exclusive distribution device. - System self diagnosis. - Cycle time: 8/12 min. - Hourly production: 60 litres.NB: mainly for cold work.
%
- Air condenser.- Vertical turbine with automatic extraction.- Minimum mixing capacity 4 lit. and maximum 8 lit.- Noise level below 70 dB.- Vertical evaporator cylinders for a larger exchange surface.- Cycle with time control or temperature control.- Exclusive distribution device. - System self diagnosis. - Cycle time: 8/12 min. - Hourly production: 60 litres.NB: mainly for cold work.
%
- Water condenser- Vertical turbine with automatic extraction.- Minimum mixing capacity 4 lit. and maximum 8 lit.- Noise level below 70 dB.- Vertical evaporator cylinders for a larger exchange surface.- Cycle with time control or temperature control.- Exclusive distribution device. - System self diagnosis. - Cycle time: 8/12 min. - Hourly production: 60 litres.NB: mainly for cold work.
%
- Water condenser- Vertical turbine with automatic extraction.- Minimum mixing capacity 4 lit. and maximum 8 lit.- Noise level below 70 dB.- Vertical evaporator cylinders for a larger exchange surface.- Cycle with time control or temperature control.- Exclusive distribution device. - System self diagnosis. - Cycle time: 8/12 min. - Hourly production: 60 litres.NB: mainly for cold work.
%
- Air condenser.- Vertical turbine with automatic extraction, low maintenance and very easy to use.- Easy installation due to its compact size.- Minimum mixing capacity 1 liter and maximum 2 liters.- Noise level below 70 dB.- Cycle with time control or with temperature control.- Vertical cylinders-evaporators for a bigger surface of exchange.- Exclusive dispensing device.- Auto diagnostic system.- Cycle time: 10/20 min.- Hourly production: 12 liters.NB: mainly for cold work.
%
- Air condenser.- Vertical turbine with automatic extraction, low maintenance and very easy to use.- Easy installation due to its compact size.- Minimum mixing capacity 1 liter and maximum 2 liters.- Noise level below 70 dB.- Cycle with time control or with temperature control.- Vertical cylinders-evaporators for a bigger surface of exchange.- Exclusive dispensing device.- Auto diagnostic system.- Cycle time: 10/20 min.- Hourly production: 12 liters.NB: mainly for cold work.
%
- Water condenser.- Vertical turbine with automatic extraction. - Minimum mixing capacity 7 lit. and maximum 12 lit. - Noise level below 70 dB. - Vertical evaporator cylinders for a larger exchange surface. - Cycle with time control or temperature control. - Exclusive distribution device. - System self diagnosis. - Cycle time: 8/12 min. - Hourly production: 75 litres. NB: mainly for cold work.
%
- Water condenser.- Vertical turbine with automatic extraction. - Minimum mixing capacity 7 lit. and maximum 12 lit. - Noise level below 70 dB. - Vertical evaporator cylinders for a larger exchange surface. - Cycle with time control or temperature control. - Exclusive distribution device. - System self diagnosis. - Cycle time: 8/12 min. - Hourly production: 75 litres. NB: mainly for cold work.